Standard Work
The documented current best practice for performing a manufacturing task, defining the sequence, timing, and standard inventory needed for consistent quality and efficiency.
Standard work is a foundational lean manufacturing practice that documents the most efficient method currently known for performing each production task. It specifies three elements: the sequence of operations an operator performs, the time required for each operation (aligned with takt time), and the standard work-in-process inventory needed to maintain smooth flow. Standard work is not about rigid control — it is about establishing a baseline of consistency that makes improvement possible. Without standard work, every operator performs tasks differently, making it impossible to identify which method is best, measure improvement, or train new operators consistently. Standard work serves as the foundation upon which all other lean improvements are built: you cannot improve a process that is not standardized, because without a standard, every variation is just another way of doing it rather than a deviation to be investigated.
The Three Elements of Standard Work
Standard work is defined by three interrelated elements. Takt time establishes the pace of production, determining how fast each task must be completed to meet customer demand. Every standard work design must fit within the takt time boundary. Work sequence defines the specific order in which an operator performs the elements of a task — from picking up the first component to placing the finished piece. The sequence is designed to minimize motion waste, prevent errors, and ensure consistent quality. It is documented with detailed step-by-step instructions, often including photos or diagrams. Standard WIP is the minimum amount of in-process inventory needed between operations to maintain continuous flow. This includes parts in machines, parts being transported, and parts in buffer positions. Standard WIP is deliberately minimized — only enough to prevent starvation — because excess WIP masks problems. Together, these three elements create a complete, repeatable description of how a process should operate. The standard work documentation is posted at the workstation and serves as both an operator reference and a training tool.
Creating Standard Work Documents
Developing standard work begins with direct observation of the current process — never from a conference room or computer desk. Watch multiple operators perform the same task and identify the best practices each one uses. Time each element of the work sequence, typically using a standardized time observation form. Combine the best elements into a single optimized sequence that meets takt time. Create three key documents: the Standard Work Combination Sheet shows the time for each manual, walking, and machine element in the sequence; the Standard Work Chart is a floor layout diagram showing the operator's movement path and the location of equipment, materials, and standard WIP; and the Standard Work Instructions provide step-by-step written and visual instructions for performing each element. These documents should be created collaboratively with the operators who perform the work — they have the deepest knowledge of the process and will more readily follow standards they helped create. Post the documents at the workstation and use them for all training.
Standard Work and Continuous Improvement
Standard work and kaizen (continuous improvement) are inseparable. The standard is not a permanent fixture — it is the current best known method, and it should be updated whenever a better method is discovered. The improvement cycle works as follows: establish the standard, follow the standard, measure performance against the standard, identify deviations and opportunities, improve the method, and update the standard. Without a standard, there is no baseline against which to measure improvement. Without improvement, the standard stagnates and operators lose faith in it. For production scheduling, standard work provides the reliable cycle time data that schedulers depend on for accurate capacity planning and delivery date calculation. When every operator follows the standard method, cycle time variability decreases, schedule adherence improves, and quality becomes more predictable. LinePlanner benefits from standard work because consistent, predictable cycle times make the production calendar more reliable — what is scheduled is what actually gets done.
Frequently Asked Questions
They are related but different. SOPs tend to be high-level documents covering broad procedures including safety and compliance steps. Standard work is a lean tool focused specifically on the operator's work sequence, timing, and WIP — designed to be visual, posted at the workstation, and directly tied to takt time.
Involve operators in creating the standard — they are more likely to follow standards they helped design. Ensure the standard is realistic and achievable. Use visual management to make the standard visible. Conduct regular audits that focus on coaching rather than punishment. Update the standard when operators find genuine improvements.
Update standard work whenever a verified improvement is made to the process — typically through kaizen activities. Also update when takt time changes (due to demand changes), when equipment or tooling changes, or when quality issues reveal a flaw in the current standard. Avoid changing too frequently, as operators need time to internalize each update.