TemplateLean Manufacturing

Standard Work Sheet Template

A lean manufacturing standard work sheet template that documents the optimal sequence, timing, and layout for performing production tasks. This template establishes the baseline for consistent quality, training, and continuous improvement.

Best For

For lean practitioners, industrial engineers, and production supervisors who need to document the current best method for each production task to ensure consistency, enable training, and provide a baseline for improvement.

What This Template Includes

The standard work sheet template consists of three interconnected documents. The **Standard Work Combination Sheet** shows a time-based chart of each work element in the operator's cycle — manual time, walk time, and machine time are distinguished by different line styles, making it clear where the operator is active and where they are waiting for machines. Total cycle time is compared against takt time to verify that the standard meets demand pace. The **Standard Work Layout** is a scaled diagram of the workstation showing machine positions, material locations, and the operator's standard walking path, numbered in sequence. This visual makes the standard method easy to understand and audit. The **Standard Work Instructions** provide detailed step-by-step written instructions for each element, supplemented with photos or diagrams for clarity. Together, these three documents completely describe how to perform the task efficiently, consistently, and safely.

How to Create Standard Work Documents

Creating standard work starts with observation at the gemba (the actual workplace). Watch multiple operators perform the task and identify the best practices each uses. Time each work element with a stopwatch, observing at least 10 cycles. Select the best elements from each operator to create the optimized sequence. Verify that the total cycle time fits within takt time — if it does not, the process needs rebalancing or improvement before standardization. Create the combination sheet first, plotting manual, walk, and machine time for each element. Then create the layout diagram, drawing the operator path and marking material and tool locations. Finally, write the detailed instructions, including quality checks and safety reminders. Critically, involve the operators in this process — they provide insights that observers miss and are more likely to follow standards they helped create. Post the completed documents at the workstation for daily reference and training.

Using Standard Work for Scheduling Accuracy

Standard work is the foundation of accurate production scheduling because it defines the reliable, repeatable cycle time that schedulers use to calculate capacity and plan delivery dates. Without standard work, cycle times vary by operator, shift, and day — making the production schedule unpredictable. With standard work, every operator follows the same method and achieves similar cycle times, making schedule adherence dramatically more reliable. When creating production plans in LinePlanner, base your time estimates on standard work cycle times rather than estimates or machine nameplate specifications. If actual performance consistently deviates from standard work times, investigate: either the standard needs updating (the process has changed) or operators need coaching (the standard is not being followed). Standard work also speeds up changeover scheduling because it defines the exact time each task takes, eliminating the guesswork that causes schedulers to either over-pad or under-estimate task durations.

Frequently Asked Questions

How is standard work different from a work instruction?

Work instructions detail how to perform a task step-by-step. Standard work goes further by specifying the time for each element, the operator's movement path, the takt time relationship, and the standard WIP level. Standard work is a lean tool tied to flow and timing; work instructions are general procedural documents.

Should standard work be updated when operators find a better method?

Absolutely — that is the point. Standard work represents the current best known method. When an operator discovers a genuine improvement (verified by time study and quality check), update the standard work documents and train all operators on the new method. This is kaizen in action.

How do you audit standard work compliance?

Supervisors should observe operators performing the standardized sequence at least once per week per workstation (leader standard work). Compare actual method and timing against the documented standard. Deviations may indicate either non-compliance (requiring coaching) or an opportunity to update the standard (if the operator found a better way).